Home
Services
About Us
Preferred Vendors
Tips
Contact
Feedback
Hiring a contractor 

 Contract requirements vary by state. Even if your state does not require a written agreement, ask for one. A contract spells out the who, what, where, when and cost of your project. The agreement should be clear, concise and complete. Before you sign a contract, make sure it contains:

 

  • The contractor's name, address, phone, and license number, if required. 
     
  • The payment schedule for the contractor, subcontractors and suppliers. 
     
  • An estimated start and completion date. 
     
  • The contractor's obligation to obtain all necessary permits. 
     
  • How change orders will be handled. A change order -- common on most remodeling jobs -- is a written authorization to the contractor to make a change or addition to the work described in the original contract. It could affect the project's cost and schedule. Remodelers often require payment for change orders before work begins. 
     
  • A detailed list of all materials including color, model, size, brand name, and product. 
     
  • Warranties covering materials and workmanship. The names and addresses of the parties honoring the warranties -- contractor, distributor or manufacturer -- must be identified. The length of the warranty period and any limitations also should be spelled out. 
     
  • What the contractor will and will not do. For example, is site clean-up and trash hauling included in the price? Ask for a "broom clause." It makes the contractor responsible for all clean-up work, including spills and stains. 
    • Oral promises also should be added to the written contract. 
       
    • A written statement of your right to cancel the contract within three business days if you signed it in your home or at a location other than the seller's permanent place of business. During the sales transaction, the salesperson (contractor) must give you two copies of a cancellation form (one to keep and one to send back to the company) and a copy of your contract or receipt. The contract or receipt must be dated, show the name and address of the seller, and explain your right to cancel.

    Keeping Records

    Keep all paperwork related to your project in one place. This includes copies of the contract, change orders and correspondence with your home improvement professionals. Keep a log or journal of all phone calls, conversations and activities. You also might want to take photographs as the job progresses. These records are especially important if you have problems with your project -- during or after construction.

    Completing the Job: A Checklist

    Before you sign off and make the final payment, use this checklist to make sure the job is complete. Check that:

    • All work meets the standards spelled out in the contract.
    • You have written warranties for materials and workmanship.
    • You have proof that all subcontractors and suppliers have been paid.
    • The job site has been cleaned up and cleared of excess materials, tools and equipment.
    • You have inspected and approved the completed work.

    From the Federal Trade Commission

 SUB-STRUCTURE CRAWL SPACE
 Visible plumbing leaks
 Disconnected ducts
 Damaged insulation
 Vents screens
 Evidence of insects
 Rodent intrusion
 EXTERIOR STRUCTURE
 Roof issues
 Runoff, downspout
 Failed caulking
 Failed finish
 Conductive conditions
 Plumbing leaks
 Bathrooms, kitchens
 Utilities
 Electronic moisture metering
 Dectet hidden leaks
 Showers, tubs,toilets
 Dishwasher, ice makers
 and much much more!
When you think house think...... Cameo

Cameo Select Home Services
7205 A Martin Way E, PMB 74
Olympia, WA 98516
Phone: 360-459-1632
Email: cameohomeinspection@comcast.net